Tagline
Sheffield remedial works
One of our remediation teams is currently engaged in Sheffield, with the objective of excavating a section of roadway down to the formation level. Upon completion of this work, the team will subsequently reconstruct the area to the appropriate level in preparation for tarmacking.



Melton Mowbray drainage works
The team has been diligently engaged in the installation of drainage systems for the new Melton Mowbray ring road. While a selection of photographs may inadequately capture the extent of their efforts, it is important to acknowledge the significant work accomplished over the past few weeks.

Old Whittington
upgrade works
We are currently engaged in a project for one of our esteemed clients, who has been experiencing challenges related to excessive surface water runoff. To address this issue, we have successfully installed approximately 60 metres of French drain, along with two soakaways, which will effectively manage the impacts of heavy rainfall. Additionally, nearly 100 metres of new ducting has been laid to facilitate electrical connections to various locations within the property. Furthermore, we are in the process of installing a gabion basket retaining wall, which will play a crucial role in mitigating the erosion of the embankment.

Basement strengthening
Characterising this project as a challenge would be an understatement. The rebar has been meticulously tied, the formwork constructed, and the concrete poured, all executed beneath a residential property and within a constrained timeline. This effort has successfully prepared the area for waterproofing, ultimately transforming it into a viable living space.